§ 32-56. Required.
It shall be unlawful for any person to erect, replace, alter or relocate any sign without first obtaining a permit to do so from the sign inspector within the city, except as provided in section 32-63. A permit is not required to repaint, change copy, or resurface an existing sign. Every permit issued by the sign inspector under the provisions of this division shall expire and become null and void if the work authorized by such permit is not commenced within 180 days from the date of such permit, or if the work authorized by such permit is suspended or abandoned at any time after the work is started, for a period of 180 days.
(Ord. No. 10-07, § 1(exh. A(15-233(A)(1))), 3-15-2010)